New Access for the Disabled 2006
steps to main entrance
side of tower for new entrance
new door positioned
new door
driveway for the new lift
 Bishop David tries the new access lift
wall before being cut for the lift
new door installed into tower
finished at last
iron railings and gate to the lift
position for the lift
- Photo Gallery: